    I have question about schedules.
    If there is a power outage during a running schedule and the touch screen resets, will the schedule continue as normal after power is restored, and if a schedule should have started but the power was off what happens to that schedule when the power comes back on?

    regards
    Trevor
     
    Trevor, Oct 18, 2021
    #1
  2. Trevor

    Graham Lamb

    Joined:
    Aug 3, 2004
    Messages:
    94
    Likes Received:
    12
    Location:
    Sydney, Australia
    Hi
    Schedules dont catch up. Schedules will run as they come up provided they are enabled if there is no enable address used schedules will run as normal after power up if you are using a enable address and GA On = enable you will need to turn it on via logic / advanced / Initialisation (ie; set GAxxx On.)
     