2.5 update homegate/sceduleplus

Discussion in 'C-Touch/HomeGate/SchedulePlus/PICED Software' started by coppo, Feb 23, 2005.

  1. coppo

    coppo

    Joined:
    Sep 7, 2004
    Messages:
    221
    Likes Received:
    10
    Location:
    Adelaide
    Please note there will be an update to the following CIS programs:

    Homegate
    Schedule+

    This will effectively update your existing version 1.3 and above to version 2.5.

    This update requires a full "released" version and will not update BETA versions.

    The update includes changes to the software itself and the accompanying
    C-gate software.
    -These are upgrade versions, and you will need a released version of the
    product installed beforehand
    -Version 1.1.5 or later of the C-Bus Toolkit is required
    -This FREE upgrade makes the products compatible with the C-Bus Toolkit
    - See "What's New" for changes and new features in the software itself,
    once installed.
    - The update is free of charge.

    Homegate update file size ( 25MB)
    Scheduleplus update file size ( 31 MB)

    http://www.cbusforums.com

    You will need to be a registered and "logged in" C-Bus Forum member to
    access to the link.

    The update will be on the forum site within the next day
     
    Last edited by a moderator: Feb 24, 2005
    coppo, Feb 23, 2005
    #1
  2. coppo

    Richo

    Joined:
    Jul 26, 2004
    Messages:
    1,257
    Likes Received:
    0
    Location:
    Adelaide
    Richo, Feb 24, 2005
    #2
  3. coppo

    coppo

    Joined:
    Sep 7, 2004
    Messages:
    221
    Likes Received:
    10
    Location:
    Adelaide
    2.5 update on the update

    as mentioned before the update will only work on full versions not BETA
    versions.

    due to this updating some of you may have to re-install your original
    Homegate or Schedule+ software.

    Seeing that you will be installing "older software" initially, you will need to
    have C-Bus V2 already installed on your computer, if it is not there , an error
    message will appear to remind you.

    to save registration issues for forum members with the old V2 software,
    we are loading V2.7.9 to the forum.

    go here for the patch update
    http://www.cbusforums.com/forums/showthread.php?t=815

    go here for the V2.7.9 software ( if required )
    http://www.cbusforums.com/forums/showthread.php?t=817

    Cheers
     
    coppo, Feb 24, 2005
    #3
  4. coppo

    mikegriff

    Joined:
    Aug 3, 2004
    Messages:
    158
    Likes Received:
    3
    Location:
    Wales
    I'm having issues getting my Beta data back to the new software

    Is there a simple guide?
    What ever I have tried the connection seems to tine out
    I only have one network so I'm assuming that the Licence isnta problem
    thanks in advance
    Mike
    Thanks heavans for roll back on XP :)
     
    mikegriff, Feb 25, 2005
    #4
  5. coppo

    Richo

    Joined:
    Jul 26, 2004
    Messages:
    1,257
    Likes Received:
    0
    Location:
    Adelaide
    Are you saying that the new release of Home Gate / Schedule Plus doesn't open the project file from an earlier beta of Home Gate or Schedule Plus?
     
    Richo, Feb 25, 2005
    #5
  6. coppo

    mikegriff

    Joined:
    Aug 3, 2004
    Messages:
    158
    Likes Received:
    3
    Location:
    Wales
    I have now started again from scratch and am still getting problems:mad:
    So with a clean install everything works fine with Homegate / Schedule Plus
    Until i set up a trigger group firing off scenes in Homegate / Schedule Plus
    When using trigger Schedule Plus loses connection with Cgate
    Toolkit itself still works ( I can turn a Group on and Off)
    Cbus level changes issued via Switches still register on Homegate / Schedule Plus
    On Schedule Plus the status bar shows 0/1 Networks On-line
    The only way of curing the problem seems to be restarting Cgate:(

    Everything worked well on the beta software which is why at first I thought it was a problem with moving the data across.
    This isnt the case as I have clean data on both cgate and Schedule Plus

    Also

    When the fault condition is active the network state shows *ERROR*

    I also have a Comfort module connected, I notice that even when Homgate /Schedule Plus change a state Toolkit reports that Comfort has changed the state! <edit> I have now disconnected the Comfort Sim and the fault condition still occurs<Edit>





    Thanks in advance
    Mike
     
    Last edited by a moderator: Feb 27, 2005
    mikegriff, Feb 26, 2005
    #6
  7. coppo

    mikegriff

    Joined:
    Aug 3, 2004
    Messages:
    158
    Likes Received:
    3
    Location:
    Wales
    I thought I had fixed this
    I seemed to have 2 Groups called the same thing ??
    I dont really understand how or why but on renaming one of them it all seemed to be working

    But then I added some more scenes and exactly the same thing

    I can trigger off a few scenes and the it loses connection
    Just on the *0/1 networks online* I'm guessing that this means onway comunication on C-Bus
    Easily fixed by rescanning the network in toolkit
    As it finds the c-bus PCI or CNI interface it all comes good again

    Even easier just open up the CNI unit in toolket and save it again
    ANY ONE ANY IDEAS ???

    I must be doing something really silly

    thanks
    Mike


    Mike
     
    Last edited by a moderator: Feb 27, 2005
    mikegriff, Feb 27, 2005
    #7
  8. coppo

    Richo

    Joined:
    Jul 26, 2004
    Messages:
    1,257
    Likes Received:
    0
    Location:
    Adelaide
    Hi Mike,

    We will investigate this. Be prepared that we may contact you off the forum if we need more info.
     
    Richo, Feb 27, 2005
    #8
  9. coppo

    mikegriff

    Joined:
    Aug 3, 2004
    Messages:
    158
    Likes Received:
    3
    Location:
    Wales
    Thanks Richo

    Mike
     
    mikegriff, Feb 27, 2005
    #9
  10. coppo

    Darren Senior Member

    Joined:
    Jul 29, 2004
    Messages:
    2,361
    Likes Received:
    0
    Location:
    Adelaide, South Australia
    "0/1 networks online" means that you have 1 network and 0 networks are on-line.

    If you click on the Options | Show Network States, you can see the states of the Networks, as reported by C-Gate. The help file has information on the meaning of the states.

    With the current versions of the software, it is best to not have the tool kit and HomeGate/Schedule Plus running at the same time. They use C-Gate in different ways which are not compatible. It is best to run one lot of software and do whatever needs to be done, then close down, close C-Gate and then run the other software. This situation will be improved in time.
     
    Darren, Feb 27, 2005
    #10
  11. coppo

    mikegriff

    Joined:
    Aug 3, 2004
    Messages:
    158
    Likes Received:
    3
    Location:
    Wales
    Amazing

    Thats that sorted then!!
    Directly I stopped having Toolkit open it seems to work

    Ive been using toolkit to open Cgate then I can connect across my PC Network to from another machine runing Schedule Plus

    Ive been tring to keep both a beta version and the new version til I had cheched every thing out

    I guess I'll have to bite the bullit and put 1.1.5 on my main control machine and remove 1.1.4

    Thanks for your help

    Mike
    PS
    Thanks for the 0/1 info - what does the s in the box on the right signify?
     
    mikegriff, Feb 28, 2005
    #11
  12. coppo

    Darren Senior Member

    Joined:
    Jul 29, 2004
    Messages:
    2,361
    Likes Received:
    0
    Location:
    Adelaide, South Australia
    The S means that the Scheduler is running. You can double click on it to toggle the state, or use the menu item, or use the check box in the Schedule Manager - your choice :)
     
    Darren, Feb 28, 2005
    #12
  13. coppo

    darrenblake

    Joined:
    Nov 1, 2004
    Messages:
    151
    Likes Received:
    0
    Location:
    Melbourne
    Scheduler Plus V3

    Hi CIS crew,

    When can we expect to see the new V3. I currently have three projects requiring unlimited network licences and logic engines. Please tell me they will b e available soon. An accurate availability date would be greatly appreciated, and yes, i have spoken to my local CIS reps.
     
    darrenblake, Mar 4, 2005
    #13
  14. coppo

    Richo

    Joined:
    Jul 26, 2004
    Messages:
    1,257
    Likes Received:
    0
    Location:
    Adelaide
    they will be available soon. :D

    I can't be more accurate than that as the testing guys have to sign off on it. The testing and verification process is lengthly and may need to be run thorugh multiple time depending if any defects are found and the severity.

    Being a 24x7 control platform we have to be as confident as possible that we have it right before release.
     
    Richo, Mar 6, 2005
    #14