DSV
30 Jan 10, 11:51 PM
Hi,
Some installation info:-
1) 13 Bridges connected to a backbone (14 networks)
2) Toolkit 1.10.9
3) Schedule Plus 4.7.2.0 on the Backbone network
3) Bridges on near side (backbone) set to send all applications to adjacent network
4) Bridges on far side set for only trigger Control application to adjacent network for 11 networks with the rest set of all applications to adjacent network.
I can open all networks in toolkit and scan all networks without any issues. When I start schedule plus, in "view network states", it only shows the backbone as open while all other networks are closed. This is after a scan in toolkit, and toolkit shutdown with c-gate still running and starting schedule plus. It also happens when using schedule plus initiating c-gate.
The schedule plus log show the following:-
30/01/2010 12:43:02 AM Start Log
30/01/2010 12:43:02 AM Schedule Plus properties:
30/01/2010 12:43:02 AM Version 4.7.2.0
30/01/2010 12:43:02 AM No Schedule Plus project loaded
30/01/2010 12:43:02 AM Command-line: "C:\Clipsal\SchedulePlus\Schedule Plus.exe" C:\Clipsal\SchedulePlus\Projects\pwc\pwc.ctd /cgate /operate /log=save
30/01/2010 12:43:02 AM Computer Properties:
30/01/2010 12:43:02 AM Name: PWC_CBUS
30/01/2010 12:43:02 AM Operating System: Windows NT 5.1 build 2600
30/01/2010 12:43:02 AM Total Memory: 2047MB
30/01/2010 12:43:02 AM Free Memory: 2047MB
30/01/2010 12:43:02 AM Settings:
30/01/2010 12:43:02 AM Start-up: Show Wizard
30/01/2010 12:43:02 AM Master Unit: Yes
30/01/2010 12:43:02 AM Auto Save: yes
30/01/2010 12:43:02 AM Show Hex Values: no
30/01/2010 12:43:02 AM Right Click Action: yes
30/01/2010 12:43:02 AM HTML Reports: yes
30/01/2010 12:43:02 AM Auto Edit: no
30/01/2010 12:43:02 AM Auto Close C-Gate: no
30/01/2010 12:43:02 AM Allow Multiple: yes
30/01/2010 12:43:02 AM Log Limit Size: yes
30/01/2010 12:43:02 AM Log Info: yes
30/01/2010 12:43:02 AM Log C-Gate: yes
30/01/2010 12:43:02 AM Log Logic: yes
30/01/2010 12:43:02 AM Log Usage: no
30/01/2010 12:43:02 AM Log E-Mail: yes
30/01/2010 12:43:02 AM Log Tx C-Bus: yes
30/01/2010 12:43:02 AM Log Rx C-Bus: yes
30/01/2010 12:43:02 AM Log Lighting: yes
30/01/2010 12:43:02 AM Log Labels: yes
30/01/2010 12:43:02 AM Log Security: yes
30/01/2010 12:43:02 AM Log Telephony: yes
30/01/2010 12:43:02 AM Log Measurement: yes
30/01/2010 12:43:02 AM Log Error App: yes
30/01/2010 12:43:02 AM Log HVAC: yes
30/01/2010 12:43:02 AM Log Date/Time App: yes
30/01/2010 12:43:02 AM Log Monitors: yes
30/01/2010 12:43:02 AM Info : Licence (dongle) details:
30/01/2010 12:43:02 AM Info : Product: SchedulePlus
30/01/2010 12:43:02 AM Info : Mode: Normal
30/01/2010 12:43:02 AM Info : Networks: Unlimited
30/01/2010 12:43:02 AM Info : Key Version: 0
30/01/2010 12:43:05 AM Info : Start Power Fail Recovery
30/01/2010 12:43:05 AM Info : End Power Fail Recovery
30/01/2010 12:43:05 AM Info : Load File "C:\Clipsal\SchedulePlus\Projects\pwc\pwc.ctd", 30/01/2010 12:42:56 AM
30/01/2010 12:43:05 AM Info : Entering Simulation Mode
30/01/2010 12:43:05 AM Info : Connect to C-Gate at 127.0.0.1
30/01/2010 12:43:05 AM C-Gate : Rx "201 Service ready: Clipsal C-Gate Version: v2.7.1 (build 2283) #cmd-syntax=1.0"
30/01/2010 12:43:05 AM C-Gate : C-Gate Version 2.7.1, build 2283 OK
30/01/2010 12:43:06 AM Info : Logic Engine Started
------ process logic Initialisation code which gets queued as the networks are off-line ------
30/01/2010 12:43:06 AM C-Gate : Networks to be opened: 254,1,2,3,4,5,6,7,8,9,16,17,18,19
30/01/2010 12:43:06 AM C-Gate : Tx "[1]project use PWC"
30/01/2010 12:43:06 AM C-Gate : Tx "[2]config set speed-write yes"
30/01/2010 12:43:06 AM C-Gate : Tx "[3]config set sync-fast-pci yes"
30/01/2010 12:43:06 AM C-Gate : Tx "[4]event e7s0c0"
30/01/2010 12:43:06 AM C-Gate : Tx "[5]session_id"
30/01/2010 12:43:06 AM C-Gate : Tx "[6]show cbus networks"
30/01/2010 12:43:06 AM C-Gate : Rx "[1] 200 OK."
30/01/2010 12:43:06 AM C-Gate : Rx "[2] 200 OK."
30/01/2010 12:43:06 AM C-Gate : Rx "[3] 200 OK."
30/01/2010 12:43:06 AM C-Gate : Rx "[4] 200 OK."
30/01/2010 12:43:06 AM C-Gate : Rx "[5] 300 sessionID=cmd19"
30/01/2010 12:43:06 AM C-Gate : Rx "[6] 300 //PWC/cbus: networks=254,19,18,17,16,9,8,7,6,5,4,3,2,1"
30/01/2010 12:43:06 AM C-Gate : Tx "[7]net open 254"
30/01/2010 12:43:06 AM C-Gate : Tx "[8]set 254 autosync yes"
30/01/2010 12:43:06 AM C-Gate : Rx "[7] 200 OK: //PWC/254"
30/01/2010 12:43:06 AM C-Gate : Rx "[8] 200 OK: //PWC/254"
30/01/2010 12:43:06 AM C-Gate : Tx "[9]net open 1"
30/01/2010 12:43:06 AM C-Gate : Tx "[10]set 1 autosync yes"
30/01/2010 12:43:06 AM C-Gate : Rx "[9] 401 Bad object or device ID: Object not found"
30/01/2010 12:43:06 AM C-Gate : Rx "[10] 401 Bad object or device ID: 1 (Object not found)"
I have waited as long as 45 minutes to see if any other network other that the backbone will come on line. If I telnet to C-gate and issue the following commands, project use and project start, schedule plus will start the sync process.
Any ideas as when this happens?
Thanks.
----------------------------------------
PS. Darren, this is the site discussed in thread http://www.cbusforums.com/forums/showthread.php?t=5730
I was forced to go down the path of schedule plus as the touch screen hangs was causing the client some major distruptrions. The Show Usage feature on the touch screen log showed the processor getting above 50% and right up to 100%.
Some installation info:-
1) 13 Bridges connected to a backbone (14 networks)
2) Toolkit 1.10.9
3) Schedule Plus 4.7.2.0 on the Backbone network
3) Bridges on near side (backbone) set to send all applications to adjacent network
4) Bridges on far side set for only trigger Control application to adjacent network for 11 networks with the rest set of all applications to adjacent network.
I can open all networks in toolkit and scan all networks without any issues. When I start schedule plus, in "view network states", it only shows the backbone as open while all other networks are closed. This is after a scan in toolkit, and toolkit shutdown with c-gate still running and starting schedule plus. It also happens when using schedule plus initiating c-gate.
The schedule plus log show the following:-
30/01/2010 12:43:02 AM Start Log
30/01/2010 12:43:02 AM Schedule Plus properties:
30/01/2010 12:43:02 AM Version 4.7.2.0
30/01/2010 12:43:02 AM No Schedule Plus project loaded
30/01/2010 12:43:02 AM Command-line: "C:\Clipsal\SchedulePlus\Schedule Plus.exe" C:\Clipsal\SchedulePlus\Projects\pwc\pwc.ctd /cgate /operate /log=save
30/01/2010 12:43:02 AM Computer Properties:
30/01/2010 12:43:02 AM Name: PWC_CBUS
30/01/2010 12:43:02 AM Operating System: Windows NT 5.1 build 2600
30/01/2010 12:43:02 AM Total Memory: 2047MB
30/01/2010 12:43:02 AM Free Memory: 2047MB
30/01/2010 12:43:02 AM Settings:
30/01/2010 12:43:02 AM Start-up: Show Wizard
30/01/2010 12:43:02 AM Master Unit: Yes
30/01/2010 12:43:02 AM Auto Save: yes
30/01/2010 12:43:02 AM Show Hex Values: no
30/01/2010 12:43:02 AM Right Click Action: yes
30/01/2010 12:43:02 AM HTML Reports: yes
30/01/2010 12:43:02 AM Auto Edit: no
30/01/2010 12:43:02 AM Auto Close C-Gate: no
30/01/2010 12:43:02 AM Allow Multiple: yes
30/01/2010 12:43:02 AM Log Limit Size: yes
30/01/2010 12:43:02 AM Log Info: yes
30/01/2010 12:43:02 AM Log C-Gate: yes
30/01/2010 12:43:02 AM Log Logic: yes
30/01/2010 12:43:02 AM Log Usage: no
30/01/2010 12:43:02 AM Log E-Mail: yes
30/01/2010 12:43:02 AM Log Tx C-Bus: yes
30/01/2010 12:43:02 AM Log Rx C-Bus: yes
30/01/2010 12:43:02 AM Log Lighting: yes
30/01/2010 12:43:02 AM Log Labels: yes
30/01/2010 12:43:02 AM Log Security: yes
30/01/2010 12:43:02 AM Log Telephony: yes
30/01/2010 12:43:02 AM Log Measurement: yes
30/01/2010 12:43:02 AM Log Error App: yes
30/01/2010 12:43:02 AM Log HVAC: yes
30/01/2010 12:43:02 AM Log Date/Time App: yes
30/01/2010 12:43:02 AM Log Monitors: yes
30/01/2010 12:43:02 AM Info : Licence (dongle) details:
30/01/2010 12:43:02 AM Info : Product: SchedulePlus
30/01/2010 12:43:02 AM Info : Mode: Normal
30/01/2010 12:43:02 AM Info : Networks: Unlimited
30/01/2010 12:43:02 AM Info : Key Version: 0
30/01/2010 12:43:05 AM Info : Start Power Fail Recovery
30/01/2010 12:43:05 AM Info : End Power Fail Recovery
30/01/2010 12:43:05 AM Info : Load File "C:\Clipsal\SchedulePlus\Projects\pwc\pwc.ctd", 30/01/2010 12:42:56 AM
30/01/2010 12:43:05 AM Info : Entering Simulation Mode
30/01/2010 12:43:05 AM Info : Connect to C-Gate at 127.0.0.1
30/01/2010 12:43:05 AM C-Gate : Rx "201 Service ready: Clipsal C-Gate Version: v2.7.1 (build 2283) #cmd-syntax=1.0"
30/01/2010 12:43:05 AM C-Gate : C-Gate Version 2.7.1, build 2283 OK
30/01/2010 12:43:06 AM Info : Logic Engine Started
------ process logic Initialisation code which gets queued as the networks are off-line ------
30/01/2010 12:43:06 AM C-Gate : Networks to be opened: 254,1,2,3,4,5,6,7,8,9,16,17,18,19
30/01/2010 12:43:06 AM C-Gate : Tx "[1]project use PWC"
30/01/2010 12:43:06 AM C-Gate : Tx "[2]config set speed-write yes"
30/01/2010 12:43:06 AM C-Gate : Tx "[3]config set sync-fast-pci yes"
30/01/2010 12:43:06 AM C-Gate : Tx "[4]event e7s0c0"
30/01/2010 12:43:06 AM C-Gate : Tx "[5]session_id"
30/01/2010 12:43:06 AM C-Gate : Tx "[6]show cbus networks"
30/01/2010 12:43:06 AM C-Gate : Rx "[1] 200 OK."
30/01/2010 12:43:06 AM C-Gate : Rx "[2] 200 OK."
30/01/2010 12:43:06 AM C-Gate : Rx "[3] 200 OK."
30/01/2010 12:43:06 AM C-Gate : Rx "[4] 200 OK."
30/01/2010 12:43:06 AM C-Gate : Rx "[5] 300 sessionID=cmd19"
30/01/2010 12:43:06 AM C-Gate : Rx "[6] 300 //PWC/cbus: networks=254,19,18,17,16,9,8,7,6,5,4,3,2,1"
30/01/2010 12:43:06 AM C-Gate : Tx "[7]net open 254"
30/01/2010 12:43:06 AM C-Gate : Tx "[8]set 254 autosync yes"
30/01/2010 12:43:06 AM C-Gate : Rx "[7] 200 OK: //PWC/254"
30/01/2010 12:43:06 AM C-Gate : Rx "[8] 200 OK: //PWC/254"
30/01/2010 12:43:06 AM C-Gate : Tx "[9]net open 1"
30/01/2010 12:43:06 AM C-Gate : Tx "[10]set 1 autosync yes"
30/01/2010 12:43:06 AM C-Gate : Rx "[9] 401 Bad object or device ID: Object not found"
30/01/2010 12:43:06 AM C-Gate : Rx "[10] 401 Bad object or device ID: 1 (Object not found)"
I have waited as long as 45 minutes to see if any other network other that the backbone will come on line. If I telnet to C-gate and issue the following commands, project use and project start, schedule plus will start the sync process.
Any ideas as when this happens?
Thanks.
----------------------------------------
PS. Darren, this is the site discussed in thread http://www.cbusforums.com/forums/showthread.php?t=5730
I was forced to go down the path of schedule plus as the touch screen hangs was causing the client some major distruptrions. The Show Usage feature on the touch screen log showed the processor getting above 50% and right up to 100%.