MichaelCarey
14 Nov 07, 06:52 AM
Hi Everybody,
Sometimes, when I am working on a PICED touch screen project, I connect it to the C-Bus network to check it's operation while it's still being "developed".
Here is an example, I have a B&W touchscreen project at home that has a number of scenes triggered by C-Bus groups. When I run this project connected to the C-Bus network, can there be a conflict with these "remote" triggered scenes becoming active on both the touchscreen AND the PICED on the PC?
The scenes are the same, I'm presuming that this isn't a problem. The C-Bus commands are basically sent twice. Can the scene manager in PICED be disabled during testing like this?
Michael.
Sometimes, when I am working on a PICED touch screen project, I connect it to the C-Bus network to check it's operation while it's still being "developed".
Here is an example, I have a B&W touchscreen project at home that has a number of scenes triggered by C-Bus groups. When I run this project connected to the C-Bus network, can there be a conflict with these "remote" triggered scenes becoming active on both the touchscreen AND the PICED on the PC?
The scenes are the same, I'm presuming that this isn't a problem. The C-Bus commands are basically sent twice. Can the scene manager in PICED be disabled during testing like this?
Michael.